Elevated view across a sedge lawn and olive garden toward a light stucco home with a recessed oak entry and pale concrete approach.

The JOST Bridge Turned a Trail That Ended at the 5 Into a Way Across It

October 22, 2026

Book a Quick Call

LET'S CONNECT

"Right now the city is kind of divided in two by the I-5 in many ways," Youssef Kaddeche of Remake Irvine Streets for Everyone told Voice of OC in the spring of 2025. He said the only safe way for walkers and cyclists to cross from the north side to the south side was "a small accession of the Peters Canyon Trail on the edge of the city."

That changed on Tuesday, August 11, 2026. That morning, after a ribbon-cutting, city officials, cyclists and neighbors walked and rode onto the Jeffrey Open Space Trail Bicycle & Pedestrian Bridge. Most coverage of the opening focused on the bridge's size. The bigger change is what it does to the trail. For more than a decade, JOST was a well-loved linear park that ended at the freeway. Now it keeps going.

Where the trail used to stop

The Jeffrey Open Space Trail opened in 2015 as a 3.5-mile path. When the Irvine Standard walked it in 2018, it described a 76-acre park you could walk, run or bike "from Portola Parkway to the I-5 Freeway without ever having to stop." The I-5 Freeway was the southern end. The same article said the trail "eventually will link Irvine's Northern and Southern Open Space Preserves, running from the mountains to the sea."

Because of that endpoint, JOST worked as a place to go and come back from. You could walk it end to end without stopping, but at the freeway end you turned around. Voice of OC's 2025 report said the trail could already help with trips such as UCI to Woodbury Town Center, but "gaps in the trail make it difficult for those traveling long stretches." Getting past those gaps meant sharing the road with cars at 55 miles per hour or crossing I-5 ramps.

What got built over the freeway

The bridge sits just south of Jeffrey Road and runs alongside it. Its entry is at Jeffrey Road and Walnut Avenue, where the ribbon-cutting took place. It crosses three things in one span: Walnut Avenue, the Jeffrey Road Park & Ride lot, and the I-5. At the north end it connects to JOST and the Cypress Village Trail. At the south end it connects to the new JOST extension.

Detail What the City of Irvine reports
Length Nearly 1,200 feet, the largest pedestrian and bicycle bridge in Irvine
Width 15 feet
Construction start March 2024
Opened August 11, 2026
Railing and lighting 2,400 linear feet of steel truss railing and 40 custom decorative steel plate light poles
Walls 300 linear feet of decorative concrete block faced with Italian Villa Stone Veneer
Named funding $14.5 million in state funding plus $5,056,000 from Caltrans

The two funding sources the city names come to about $19.6 million. That figure is useful for scale. The Irvine Standard described the original 3.5-mile park as a "$30 million park" in 2018. The state money was secured by U.S. Representative Dave Min, who was a State Senator at the time. The city's trail page traces that allocation to August 2021.

The design takes cues from the original trail. The city says the bridge's architecture drew on the existing JOST and on the Jeffrey Open Space Spine Community Consensus Plan. It also says the lighting was designed so the bridge works and looks good at night as well as during the day. At the opening, Mayor Larry Agran said the bridge "completes a vital 5-mile corridor through the heart of our City."

What's north of the bridge

Now that you can reach JOST from the south over a bridge, the original trail becomes the north half of a longer route. Its main features haven't changed. The Irvine Standard's 2018 walking tour described them in this order:

  1. Long Meadow Tunnel. It's one of the trail's stacked-stone tunnels. On the far side is a half-mile stretch of lawn where the path splits into a wide concrete trail through grass and a gravel trail under trees.
  2. The orange pavilion. An open pavilion in a small orange grove. Its hand-tiled art honors Irvine's historic orange-crate labels and the Irvine Valencia Growers.
  3. Fourteen timber posts. These were the vertical beams that held up the floor of an orange packing house that once stood on the site. Now they stand upright as an art installation.
  4. Creek beds and an informal botanical garden. Plantings include Fairy Tales grass, Deer Grass and lilac-flowered Society Garlic.
  5. Historical markers. They cover more than 500 years of local history: California's first appearance on a map in 1542, James Irvine becoming sole owner of the Irvine Ranch in 1876, and California's first airplane flight taking off from an Irvine bean field in 1909.

The full trail has two stone tunnels and three metal footbridges. The new bridge is a fourth crossing, much larger than the others, and it goes over the freeway that used to end the walk.

What's south of the bridge, and how far it goes

The city's own pages describe the southern end in different ways. The opening-day release says the trail "has been extended from Walnut to Smoke Tree and will eventually reach Barranca Parkway." The JOST Extension Project page refers to a "JOST Extension (Barranca to Walnut)" project as completed. The city's Jeffrey Open Space Trail page describes the full plan as a 1.5-mile extension from Barranca Parkway to the 5 Freeway.

For a weekend walk, the safest plan is the dated release. It says the extension runs south from Walnut Avenue to Smoke Tree, with Barranca Parkway still to come and no date announced. If you want to ride all the way to Barranca, check the project page first. The city's Bikeways Map shows how the trail connects to the rest of the bike network.

Even the shorter southern piece changes what the trail is for. The city places the bridge in a regional network that runs from the Pacific Ocean to the Santa Ana Mountains and Cleveland National Forest. The trips Voice of OC described in 2025, such as UCI to Woodbury Town Center, no longer require dealing with freeway ramps at the Jeffrey Road crossing. Kaddeche expected the extension to serve as "a really vital north and south bicycle corridor."

Getting to the bridge

For the opening, the city sent visitors to the Caltrans Park & Ride lot at 5595 Walnut Avenue, the lot the bridge passes over, and encouraged people to bike in. That lot is right next to the Jeffrey Road and Walnut Avenue entry, which makes it a practical starting point for a first visit. But the city listed it as event parking. It hasn't been named a permanent trailhead.

If you live near the trail, starting on foot or by bike makes the most sense. The north end of the bridge connects to the Cypress Village Trail as well as JOST, so neighborhoods on both trails can reach the crossing without a car.

The rainy-season check before you go

When heavy rain is in the forecast, the city has closed Open Space Preserve South, which includes Bommer Canyon, Quail Hill and Shady Canyon, ahead of the storm because of possible localized flooding. Its closure notice gave no reopening date and said updates would come on the page and on social media.

The bike trails have their own status updates. For real-time closure information on bike trails, the city points residents to its social media channels or to 949-724-7600 during business hours. Before a wet-weekend walk on JOST, check the city's field and trail closures page or call that number. Bike trails and the preserves get separate status updates, so one being open doesn't tell you about the other.

A Saturday in November and one in December to try it

Saturday, November 7, has two events on the city calendar. Citywide Serve Day, organized by the city and Love Irvine, starts at 7:30 a.m. at Woodbridge Village Center and includes more than 20 volunteer projects. The same day, the Holiday Faire at Great Park will feature handmade gifts and local vendors. Later in the season, Illuminate Irvine at Great Park runs Saturday, December 5, from 3 to 7 p.m. That night the Holiday Tree and Palm Court Arts Complex are lit, and the light display runs daily from dusk to 9 p.m. after that.

Great Park is also where the new Canopy retail center is still filling in. We covered it in our look at the corridor's first year. If you're heading to the Faire, it's an easy add-on stop.

The bridge is the newest piece of Irvine's trail network, and the Irvine neighborhood guide covers the villages it now connects. If you'd like to talk through which parts of Irvine sit closest to JOST, the Cypress Village Trail or the new southern extension, Vanessa Moore is glad to share what she knows. Let's Connect.

Your Coastal Move, Made Simple

I’m here to help with every step, reach out today and let’s make your coastal dream a reality.